On Fri, 28 Jul 2006, Andrei Ispas wrote:
The failover scenario is working well from the active
connections point of view, these remained Ok.
The new connections added are synchronized on the
backup, but these are not added in the table used by
the "scheduler" (/proc/net/ip_vs_conn and not the
/proc/net/ip_vs).
Horms would be the best person to answer this. He's taking a
bit of vacation on the way back from OLS. I expect he'll
answer this shortly. In the meantime you could look at the
scripts to see why the master information isn't being
updated.
Joe
--
Joseph Mack NA3T EME(B,D), FM05lw North Carolina
jmack (at) wm7d (dot) net - azimuthal equidistant map
generator at http://www.wm7d.net/azproj.shtml
Homepage http://www.austintek.com/ It's GNU/Linux!
|